Further investigation (FI)

An code for a possible issue the inspector can't classify until more is found out. It isn't a fault-finding job, and BPG4 says a code should generally be possible in a domestic installation without one. On the A4 model report, FI is advisory and doesn't change the overall assessment by itself, but the person who ordered the report should get it looked into as soon as possible.

Where to look it up: BPG4 Issue 7.4; BS 7671 Appendix 6.

Using Further investigation (FI) in context

Reviewed

A distinction worth remembering

Condition reporting is about the installation inspected and the risk identified. A difference from a current recommendation is not automatically a dangerous defect. Describe the observation, extent and limitation clearly, and distinguish a justified further-investigation recommendation from work that could have been completed within the agreed inspection.

Questions to take further

How can I revise Further investigation (FI) beyond the definition?
Explain what Further investigation (FI) describes, compare it with a related term and use it in a topic question. State any assumptions and what evidence you would need before applying the idea to real work.

Sources

Report a mistake

Where Further investigation (FI) fits in the learning path

The Testing & Inspection section covers these units:

  • Initial Verification & Dead Testing
  • Live Testing
  • Inspection & Certification

Curriculum mapping: C&G 2365 Unit 304 / 2391.

See this section in the full curriculum

This section is on the Plus path. Lesson availability depends on content review and your learning path.

Read, practise, return

  1. 1. Read it in context

  2. 2. Try recalling, then explore practice

    Use the memory prompt below to connect the vocabulary.

  3. 3. Return to the meaning

    After reading or practising, explain the idea in your own words, then check what you remembered.

    Revisit the Further investigation (FI) definition

Recall a related term

Which term fits this definition? Say it to yourself, then reveal it. This is a memory prompt, with no score or saved result.

The report produced by a periodic inspection of an existing installation, recording its condition against the current edition of BS 7671. Observations are classified by urgency — C1 for danger present, C2 for potentially dangerous, C3 for improvement recommended, and FI where further investigation is needed — and a C1 or C2 makes the report unsatisfactory.

Open a meaning to compare its role with Further investigation (FI), or follow its full entry.

EICR — Electrical Installation Condition Report

The report produced by a periodic inspection of an existing installation, recording its condition against the current edition of BS 7671. Observations are classified by urgency — C1 for danger present, C2 for potentially dangerous, C3 for improvement recommended, and FI where further investigation is needed — and a C1 or C2 makes the report unsatisfactory.

Read the EICR entry
Limitation (EICR)

Something that stops part of an installation being inspected or tested during a periodic inspection, recorded on the report with its reasons. Agreed limitations are settled with the person ordering the report, and operational ones turn up on site, such as a locked room. The more there are, the less the report can tell anyone, and a limitation never excuses hiding a known danger.

Read the Limitation (EICR) entry
Remedial work

Work that puts right a defect an inspection found, such as a C1 or C2 on an EICR. It's recorded on its own paperwork, normally a Minor Works Certificate or an Electrical Installation Certificate, because an EICR reports on condition and isn't issued for a repair. In rented homes in England, and private tenancies in Northern Ireland, the landlord has to get a qualified person to do it within 28 days of the inspection, or sooner if the report says so. Wales and Scotland set their landlord duties in their own laws, so check the rules for where the home is.

Read the Remedial work entry

A definition is a start. Using it in a real question is where it sticks.

By starting, you agree to our Terms and Privacy notice.