Inspection & Testing

Premium quiz

C&G 2365 Level 3 / 2391 · Testing & Inspection

The dead-before-live sequence, what each measurement proves and the results that should make you stop — practised in the order the real job demands.

  • Dead-before-live test sequence
  • Insulation resistance
  • Earth fault loop impedance

Sample questions

Answers stay hidden on this preview — sign up free to play the quiz with instant feedback.

These sample questions are practice material and have not yet been reviewed by a qualified electrician. They are for revision only — working to BS 7671 on site is never decided by a quiz.

  1. Q1.Which group of tests must be completed before an installation is first energised?

    • Live tests
    • Dead tests
    • Functional tests only
    • RCD trip-time tests
  2. Q2.What does an insulation-resistance test look for?

    • Breaks in a ring final circuit
    • Leakage paths between conductors
    • The supply frequency
    • Lamp wattage
  3. Q3.Which test proves that single-pole switches are connected in the line conductor?

    • Polarity
    • Continuity of bonding
    • RCD trip time
    • Prospective fault current
  4. Q4.Zs is the measured value of what?

    • Insulation resistance
    • Earth fault loop impedance
    • Voltage drop
    • Supply frequency

The full Inspection & Testing quiz is part of Premium

Sign up free to start the course — Premium unlocks this section's full question bank, worked reasoning for every question and spaced-repetition review.

Start free

Revising this area? Read the full topic guide

Inspection & Testing Practice Quiz — Free | TradeTraining