Inspection & Testing
Premium quizC&G 2365 Level 3 / 2391 · Testing & Inspection
The dead-before-live sequence, what each measurement proves and the results that should make you stop — practised in the order the real job demands.
- Dead-before-live test sequence
- Insulation resistance
- Earth fault loop impedance
Sample questions
Answers stay hidden on this preview — sign up free to play the quiz with instant feedback.
These sample questions are practice material and have not yet been reviewed by a qualified electrician. They are for revision only — working to BS 7671 on site is never decided by a quiz.
Q1.Which group of tests must be completed before an installation is first energised?
- Live tests
- Dead tests
- Functional tests only
- RCD trip-time tests
Q2.What does an insulation-resistance test look for?
- Breaks in a ring final circuit
- Leakage paths between conductors
- The supply frequency
- Lamp wattage
Q3.Which test proves that single-pole switches are connected in the line conductor?
- Polarity
- Continuity of bonding
- RCD trip time
- Prospective fault current
Q4.Zs is the measured value of what?
- Insulation resistance
- Earth fault loop impedance
- Voltage drop
- Supply frequency