Continuity testing
Low-resistance measurement proving that conductors which must be complete actually are. That means protective conductors back to the terminal, bonding conductors to services, and the legs of . Performed dead with a low-ohm meter, it is the first step of the test sequence because everything after it assumes the earth path exists.
Taught and practised in the Testing & Inspection section.
Practise it in context
Related terms
Definitions are a start — the exam wants you to use them.
Practise free