The sequence is the discipline: continuity of protective conductors, ring final continuity, and are proved dead, before earth-fault loop impedance, and operation are checked live. Doing them in order means each test is only performed on a circuit the previous tests have already made safe to test.

Each measurement has a why. catches damaged cables before they leak; catches the switch wired into the neutral; loop impedance proves a fault would actually trip the protection fast enough.

This is the heart of C&G 2365 Unit 304 and the 2391 inspection qualification, and our ordering exercises and practice questions train the sequence until it runs itself.

Common questions

Is there a free Inspection & Testing quiz?
Inspection & Testing sits in the Testing & Inspection section, which is part of TradeTraining Premium — but the app is free to start, sample questions are open to everyone, and the free sections cover the fundamentals first.
Where does Inspection & Testing sit in the City & Guilds scheme?
Inspection & Testing maps to C&G 2365 Unit 304 / C&G 2391. On TradeTraining it lives in the Testing & Inspection section as bite-size lessons with practice questions.
Why do dead tests come before live tests?
Because the dead tests prove the installation is safe to energise at all. Continuity, and faults are found while nothing can hurt you; only once those pass does the circuit get power for loop impedance and RCD tests. Reversing the order means energising an unproven installation.