EICR

Electrical Installation Condition Report

The report produced by a periodic inspection of an existing installation, recording its condition against the edition of BS 7671. Observations are classified by urgency — C1 for danger present, C2 for potentially dangerous, C3 for improvement recommended, and FI where further investigation is needed — and a C1 or C2 makes the report unsatisfactory.

Where EICR fits in the learning path

The Testing & Inspection section covers these units:

  • Initial Verification & Dead Testing
  • Live Testing
  • Inspection & Certification

Curriculum mapping: C&G 2365 Unit 304 / 2391.

See this section in the full curriculum

This section is on the Plus path. Lesson availability depends on content review and your learning path.

Read, practise, return

  1. 1. Read it in context

  2. 2. Try recalling, then explore practice

    Use the memory prompt below to connect the vocabulary.

  3. 3. Return to the meaning

    After reading or practising, explain the idea in your own words. Revisit the EICR definition to check what you remembered.

Recall a related term

Which term fits this definition? Say it to yourself, then reveal it. This is a memory prompt, with no score or saved result.

The resistance between conductors that should be completely separated from each other. It is measured in megohms, line to neutral and each to earth, with a test instrument applying an elevated DC voltage. Healthy insulation reads very high; damaged cables, moisture or pinched conductors show up as a low reading long before they show up as a shock or a fire.

Open a meaning to compare its role with EICR, or follow its full entry.

Insulation resistance

The resistance between conductors that should be completely separated from each other. It is measured in megohms, line to neutral and each to earth, with a test instrument applying an elevated DC voltage. Healthy insulation reads very high; damaged cables, moisture or pinched conductors show up as a low reading long before they show up as a shock or a fire.

Read the Insulation resistance entry
Zs — Earth Fault Loop Impedance

The total opposition to current around the loop a fault current would travel. That loop runs from the supply, along the line conductor to the fault, and back through the protective conductor and the earthing. It is the supply's own part (Ze) plus the circuit's R1 + R2, the resistance of its line and protective conductors. A low Zs lets a big fault current flow, which trips the protective device quickly, so electricians measure it and compare it with the maximum allowed for that device.

Read the Zs entry
Continuity testing

Low-resistance measurement proving that conductors which must be complete actually are. That means protective conductors back to the earthing terminal, bonding conductors to services, and the legs of ring final circuits. Performed dead with a low-ohm meter, it is the first step of the test sequence because everything after it assumes the earth path exists.

Read the Continuity testing entry

A definition is a start. Using it in a real question is where it sticks.

EICR Meaning — UK Electrical Glossary | TradeTraining