Schedule of inspections

The checklist attached to an or showing what was inspected; the A4 model forms mostly title it Schedule of Inspection. On an EIC, each item is ticked or marked not applicable. On an EICR, each item gets an outcome: acceptable, C1 or C2, C3, FI, not verified, limitation or not applicable. The certificate or report isn't valid without it.

Where to look it up: BS 7671 Appendix 6.

Using Schedule of inspections in context

Reviewed

A distinction worth remembering

Inspection can identify unsuitable equipment or visible damage that a satisfactory resistance reading cannot rule out. Measurements add evidence about particular properties. A report needs both, with the scope and limitations recorded.

Questions to take further

How can I revise Schedule of inspections beyond the definition?
Explain what Schedule of inspections describes, compare it with a related term and use it in a topic question. State any assumptions and what evidence you would need before applying the idea to real work.

Sources

Report a mistake

Where Schedule of inspections fits in the learning path

The Inspection and Testing in Depth section covers these units:

  • Reading Test Results
  • The EICR from Arrival to Handover
  • Testing Tricky Installations
  • Coding Drills by Room

Curriculum mapping: C&G 2391-52 and 2365 Unit 304.

See this section in the full curriculum

This section is on the Plus path. Lesson availability depends on content review and your learning path.

Read, practise, return

  1. 1. Read it in context

  2. 2. Try recalling, then explore practice

    Use the memory prompt below to connect the vocabulary.

  3. 3. Return to the meaning

    After reading or practising, explain the idea in your own words, then check what you remembered.

    Revisit the Schedule of inspections definition

Recall a related term

Which term fits this definition? Say it to yourself, then reveal it. This is a memory prompt, with no score or saved result.

The report produced by a periodic inspection of an existing installation, recording its condition against the current edition of BS 7671. Observations are classified by urgency — C1 for danger present, C2 for potentially dangerous, C3 for improvement recommended, and FI where further investigation is needed — and a C1 or C2 makes the report unsatisfactory.

Open a meaning to compare its role with Schedule of inspections, or follow its full entry.

EICR — Electrical Installation Condition Report

The report produced by a periodic inspection of an existing installation, recording its condition against the current edition of BS 7671. Observations are classified by urgency — C1 for danger present, C2 for potentially dangerous, C3 for improvement recommended, and FI where further investigation is needed — and a C1 or C2 makes the report unsatisfactory.

Read the EICR entry
Electrical Installation Certificate — EIC

The certificate for electrical work that goes beyond minor works. That means a new installation, an addition or alteration with a new circuit, or a replacement consumer unit or distribution board. It records the design, construction, inspection and testing, it's only valid with its schedules attached, and the original goes to the person who ordered the work. It's a record of that job, not proof that anyone is qualified or registered.

Read the Electrical Installation Certificate entry
Schedule of test results

The table attached to an EIC or EICR that records each circuit's readings, such as continuity, insulation resistance, polarity, Zs and RCD operating times. Each row is one circuit, so a reading that's out of line stands out. Compare the readings with their limits before signing, because the next person to inspect the installation will use them as a baseline.

Read the Schedule of test results entry

A definition is a start. Using it in a real question is where it sticks.

By starting, you agree to our Terms and Privacy notice.