Schedule of test results

The table attached to an or that records each circuit's readings, such as continuity, , , Zs and RCD operating times. Each row is one circuit, so a reading that's out of line stands out. Compare the readings with their limits before signing, because the next person to inspect the installation will use them as a baseline.

Where to look it up: BS 7671 Appendix 6.

Using Schedule of test results in context

Reviewed

A distinction worth remembering

Inspection can identify unsuitable equipment or visible damage that a satisfactory resistance reading cannot rule out. Measurements add evidence about particular properties. A report needs both, with the scope and limitations recorded.

Questions to take further

How can I revise Schedule of test results beyond the definition?
Explain what Schedule of test results describes, compare it with a related term and use it in a topic question. State any assumptions and what evidence you would need before applying the idea to real work.

Sources

Report a mistake

Where Schedule of test results fits in the learning path

The Inspection and Testing in Depth section covers these units:

  • Reading Test Results
  • The EICR from Arrival to Handover
  • Testing Tricky Installations
  • Coding Drills by Room

Curriculum mapping: C&G 2391-52 and 2365 Unit 304.

See this section in the full curriculum

This section is on the Plus path. Lesson availability depends on content review and your learning path.

Read, practise, return

  1. 1. Read it in context

  2. 2. Try recalling, then explore practice

    Use the memory prompt below to connect the vocabulary.

  3. 3. Return to the meaning

    After reading or practising, explain the idea in your own words, then check what you remembered.

    Revisit the Schedule of test results definition

Recall a related term

Which term fits this definition? Say it to yourself, then reveal it. This is a memory prompt, with no score or saved result.

The total impedance of the earth-fault-current loop at a point in an installation, including the supply and the installation's fault-return path. For many circuits, Ze plus R1+R2 is a useful approximation, with conductor temperature and measurement conditions taken into account. The result must be assessed against the actual protective arrangement and required disconnection conditions.

Open a meaning to compare its role with Schedule of test results, or follow its full entry.

Zs — Earth Fault Loop Impedance

The total impedance of the earth-fault-current loop at a point in an installation, including the supply and the installation's fault-return path. For many circuits, Ze plus R1+R2 is a useful approximation, with conductor temperature and measurement conditions taken into account. The result must be assessed against the actual protective arrangement and required disconnection conditions.

Read the Zs entry
Insulation resistance

A measure of how strongly insulation opposes current between parts intended to be electrically separated, usually expressed in megohms. An insulation-resistance instrument applies a DC test voltage. Connected electronics, moisture and contamination can affect the method or reading; an unexpected result needs investigation. A single satisfactory result does not establish every aspect of an installation's safety.

Read the Insulation resistance entry
R1+R2

R1+R2 is the combined resistance of a circuit’s line conductor (R1) and circuit protective conductor (R2) along the path being checked, measured in ohms during dead testing. The result helps verify protective-conductor continuity and, with the external earth-fault-loop impedance Ze, assess the circuit’s Zs.

Read the R1+R2 entry
Schedule of inspections

The checklist attached to an EIC or EICR showing what was inspected; the A4 model forms mostly title it Schedule of Inspection. On an EIC, each item is ticked or marked not applicable. On an EICR, each item gets an outcome: acceptable, C1 or C2, C3, FI, not verified, limitation or not applicable. The certificate or report isn't valid without it.

Read the Schedule of inspections entry
Electrical Installation Certificate — EIC

The certificate for electrical work that goes beyond minor works. That means a new installation, an addition or alteration with a new circuit, or a replacement consumer unit or distribution board. It records the design, construction, inspection and testing, it's only valid with its schedules attached, and the original goes to the person who ordered the work. It's a record of that job, not proof that anyone is qualified or registered.