Schedule of test results
The table attached to an or that records each circuit's readings, such as continuity, , , Zs and RCD operating times. Each row is one circuit, so a reading that's out of line stands out. Compare the readings with their limits before signing, because the next person to inspect the installation will use them as a baseline.
Using Schedule of test results in context
Reviewed
A distinction worth remembering
Inspection can identify unsuitable equipment or visible damage that a satisfactory resistance reading cannot rule out. Measurements add evidence about particular properties. A report needs both, with the scope and limitations recorded.
Questions to take further
- How can I revise Schedule of test results beyond the definition?
- Explain what Schedule of test results describes, compare it with a related term and use it in a topic question. State any assumptions and what evidence you would need before applying the idea to real work.
Sources
- IET: inspection and testing FAQs — Inspection, test interpretation and protecting equipment during testing.
Where Schedule of test results fits in the learning path
The Inspection and Testing in Depth section covers these units:
- Reading Test Results
- The EICR from Arrival to Handover
- Testing Tricky Installations
- Coding Drills by Room
Curriculum mapping: C&G 2391-52 and 2365 Unit 304.
See this section in the full curriculum
This section is on the Plus path. Lesson availability depends on content review and your learning path.
Read, practise, return
1. Read it in context
- Inspection & TestingTesting & Inspection
- Dead Testing SequenceTesting & Inspection
2. Try recalling, then explore practice
Use the memory prompt below to connect the vocabulary.
- Inspection & Testing — quiz previewPlus · Testing & Inspection
3. Return to the meaning
After reading or practising, explain the idea in your own words, then check what you remembered.
Recall a related term
Which term fits this definition? Say it to yourself, then reveal it. This is a memory prompt, with no score or saved result.
The total impedance of the earth-fault-current loop at a point in an installation, including the supply and the installation's fault-return path. For many circuits, Ze plus R1+R2 is a useful approximation, with conductor temperature and measurement conditions taken into account. The result must be assessed against the actual protective arrangement and required disconnection conditions.
Compare related terms
Open a meaning to compare its role with Schedule of test results, or follow its full entry.
Zs — Earth Fault Loop Impedance
The total impedance of the earth-fault-current loop at a point in an installation, including the supply and the installation's fault-return path. For many circuits, Ze plus R1+R2 is a useful approximation, with conductor temperature and measurement conditions taken into account. The result must be assessed against the actual protective arrangement and required disconnection conditions.
Read the Zs entryInsulation resistance
A measure of how strongly insulation opposes current between parts intended to be electrically separated, usually expressed in megohms. An insulation-resistance instrument applies a DC test voltage. Connected electronics, moisture and contamination can affect the method or reading; an unexpected result needs investigation. A single satisfactory result does not establish every aspect of an installation's safety.
Read the Insulation resistance entryR1+R2
R1+R2 is the combined resistance of a circuit’s line conductor (R1) and circuit protective conductor (R2) along the path being checked, measured in ohms during dead testing. The result helps verify protective-conductor continuity and, with the external earth-fault-loop impedance Ze, assess the circuit’s Zs.
Read the R1+R2 entrySchedule of inspections
The checklist attached to an EIC or EICR showing what was inspected; the A4 model forms mostly title it Schedule of Inspection. On an EIC, each item is ticked or marked not applicable. On an EICR, each item gets an outcome: acceptable, C1 or C2, C3, FI, not verified, limitation or not applicable. The certificate or report isn't valid without it.
Read the Schedule of inspections entryElectrical Installation Certificate — EIC
The certificate for electrical work that goes beyond minor works. That means a new installation, an addition or alteration with a new circuit, or a replacement consumer unit or distribution board. It records the design, construction, inspection and testing, it's only valid with its schedules attached, and the original goes to the person who ordered the work. It's a record of that job, not proof that anyone is qualified or registered.
Read the Electrical Installation Certificate entryA definition is a start. Using it in a real question is where it sticks.