The certificate for electrical work that goes beyond minor works. That means a new installation, an addition or alteration with a new circuit, or a replacement or distribution board. It records the design, construction, inspection and testing, it's only valid with its schedules attached, and the original goes to the person who ordered the work. It's a record of that job, not proof that anyone is qualified or registered.

Where to look it up: BS 7671 Appendix 6.

Using Electrical Installation Certificate in context

Reviewed

A distinction worth remembering

Inspection can identify unsuitable equipment or visible damage that a satisfactory resistance reading cannot rule out. Measurements add evidence about particular properties. A report needs both, with the scope and limitations recorded.

Questions to take further

How can I revise Electrical Installation Certificate beyond the definition?
Explain what Electrical Installation Certificate describes, compare it with a related term and use it in a topic question. State any assumptions and what evidence you would need before applying the idea to real work.

Sources

Report a mistake

Where Electrical Installation Certificate fits in the learning path

The Testing & Inspection section covers these units:

  • Initial Verification & Dead Testing
  • Live Testing
  • Inspection & Certification

Curriculum mapping: C&G 2365 Unit 304 / 2391.

See this section in the full curriculum

This section is on the Plus path. Lesson availability depends on content review and your learning path.

Read, practise, return

  1. 1. Read it in context

  2. 2. Try recalling, then explore practice

    Use the memory prompt below to connect the vocabulary.

  3. 3. Return to the meaning

    After reading or practising, explain the idea in your own words, then check what you remembered.

    Revisit the Electrical Installation Certificate definition

Recall a related term

Which term fits this definition? Say it to yourself, then reveal it. This is a memory prompt, with no score or saved result.

Domestic electrical work that must be notified under Part P of the Building Regulations in England and Wales. Wales covers more kinds of work than England; Scotland and Northern Ireland run their own systems. It includes a new circuit, a replacement consumer unit and some work in bathrooms. There are two main lawful routes: an electrician registered with a competent-person scheme certifies and notifies it, or the householder tells local authority building control before starting and pays for it to be inspected. In England only, an installer who is not scheme-registered can also book a registered third-party certifier before work starts, to inspect and certify the job.

Open a meaning to compare its role with Electrical Installation Certificate, or follow its full entry.

Notifiable work

Domestic electrical work that must be notified under Part P of the Building Regulations in England and Wales. Wales covers more kinds of work than England; Scotland and Northern Ireland run their own systems. It includes a new circuit, a replacement consumer unit and some work in bathrooms. There are two main lawful routes: an electrician registered with a competent-person scheme certifies and notifies it, or the householder tells local authority building control before starting and pays for it to be inspected. In England only, an installer who is not scheme-registered can also book a registered third-party certifier before work starts, to inspect and certify the job.

Read the Notifiable work entry
Minor Works Certificate — Minor Electrical Installation Works Certificate

The form for small electrical work that doesn't add a new circuit, such as an extra socket on an existing circuit or a repair. A new circuit or a replacement consumer unit needs an Electrical Installation Certificate instead. The work still gets inspected and tested, and the form records that for the person who ordered it. It says nothing about the installer's own qualifications.

Read the Minor Works Certificate entry
Schedule of inspections

The checklist attached to an EIC or EICR showing what was inspected; the A4 model forms mostly title it Schedule of Inspection. On an EIC, each item is ticked or marked not applicable. On an EICR, each item gets an outcome: acceptable, C1 or C2, C3, FI, not verified, limitation or not applicable. The certificate or report isn't valid without it.

Read the Schedule of inspections entry
Schedule of test results

The table attached to an EIC or EICR that records each circuit's readings, such as continuity, insulation resistance, polarity, Zs and RCD operating times. Each row is one circuit, so a reading that's out of line stands out. Compare the readings with their limits before signing, because the next person to inspect the installation will use them as a baseline.

Read the Schedule of test results entry
EICR — Electrical Installation Condition Report

The report produced by a periodic inspection of an existing installation, recording its condition against the current edition of BS 7671. Observations are classified by urgency — C1 for danger present, C2 for potentially dangerous, C3 for improvement recommended, and FI where further investigation is needed — and a C1 or C2 makes the report unsatisfactory.