Polarity
Verification that conductors are connected the right way round throughout an installation. Single-pole switches and protective devices must sit in the line conductor, the centre contact of screw lampholders on line, and socket terminals wired as marked. A polarity fault can leave equipment live when switched off — which is why it is checked dead and confirmed again live.
Where Polarity fits in the learning path
The Testing & Inspection section covers these units:
- Initial Verification & Dead Testing
- Live Testing
- Inspection & Certification
Curriculum mapping: C&G 2365 Unit 304 / 2391.
See this section in the full curriculum
This section is on the Plus path. Lesson availability depends on content review and your learning path.
Read, practise, return
1. Read it in context
- Inspection & TestingTesting & Inspection
- UK Cable ColoursSparks Basics
2. Try recalling, then explore practice
Use the memory prompt below to connect the vocabulary.
- Inspection & Testing — quiz previewPlus · Testing & Inspection
3. Return to the meaning
After reading or practising, explain the idea in your own words. Revisit the Polarity definition to check what you remembered.
Recall a related term
Which term fits this definition? Say it to yourself, then reveal it. This is a memory prompt, with no score or saved result.
Low-resistance measurement proving that conductors which must be complete actually are. That means protective conductors back to the earthing terminal, bonding conductors to services, and the legs of ring final circuits. Performed dead with a low-ohm meter, it is the first step of the test sequence because everything after it assumes the earth path exists.
Continuity testing
Read the Continuity testing entryCompare related terms
Open a meaning to compare its role with Polarity, or follow its full entry.
Continuity testing
Low-resistance measurement proving that conductors which must be complete actually are. That means protective conductors back to the earthing terminal, bonding conductors to services, and the legs of ring final circuits. Performed dead with a low-ohm meter, it is the first step of the test sequence because everything after it assumes the earth path exists.
Read the Continuity testing entrySafe isolation
The procedure that proves a circuit dead before anyone works on it. Prove the voltage indicator against a known source, isolate the circuit, secure the isolation with your own lock and tag, prove the point of work dead across all conductor combinations, then prove the indicator again. The final step is the one that catches a tester that died mid-job.
Read the Safe isolation entryCPC — Circuit Protective Conductor
The earth wire of a circuit. It links the metal parts of the equipment the circuit feeds back to the main earthing terminal. It is not the normal load-current return path, although equipment can produce protective-conductor current in normal operation. During an earth fault it provides a path for fault current, working with the earthing arrangement and protective device to achieve disconnection. In UK wiring it is green and yellow, or bare inside twin-and-earth cable, with green-and-yellow sleeving wherever it is exposed.
Read the CPC entryA definition is a start. Using it in a real question is where it sticks.